| 47 | == Power-Up Sequence == |
| 48 | Once the previous steps are complete, your BH8-SERIES System is ready for use. Power up the system according to the instructions below: |
| 49 | |
| 50 | 1. Verify the DB-9 extension cable is plugged into the desired communications port (or Peak USB to CAN adapter) and into the 9-pin connector on the back of the Power Supply. |
| 51 | 1. Verify the Hand Cable is plugged into the the back of the Power Supply and into the bottom of the !BarrettHand™. |
| 52 | 1. Verify the AC line Line Cord cord is plugged into a valid power source and into the power outlet on the Power Supply. |
| 53 | 1. Turn on the host computer. |
| 54 | 1. Turn on the Power Supply. The main power switch is located on the back panel. |
| 55 | 1. The !BarrettHand™ is now ready for operation. |