Changes between Version 8 and Version 9 of Hand/262/HardwareSetupSettings


Ignore:
Timestamp:
May 17, 2011, 7:53:15 PM (14 years ago)
Author:
edison
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Hand/262/HardwareSetupSettings

    v8 v9  
    4646Once the previous steps are complete, your BH8-SERIES System is ready for use.  Power up the system according to the instructions below:
    4747
    48         1. Verify the DB-9 extension cable is plugged into the desired communications port (or Peak USB to CAN adapter) and into the 9-pin connector on the back of the Power Supply.
     48        1. Verify the DB-9 extension cable is plugged into the desired communications port and into the 9-pin connector on the back of the Power Supply.
    4949        1. Verify the Hand Cable is plugged into the the back of the Power Supply and into the bottom of the !BarrettHand™.
    5050        1. Verify the AC line Line Cord cord is plugged into a valid power source and into the power outlet on the Power Supply.